Tunnel Boring a Mine Slope

780481

2/1/1978

Authors
Abstract
Content
Tunneling with a boring machine has been used extensively in the construction industry but has been virtually ignored by the mining industry. Looking for a faster and more economical way of constructing a mine slope, the Rochester & Pittsburgh Coal Company turned to a tunnel boring machine to replace the former drilling and shooting method. The results of this decision and the construction of two coal mine slopes are discussed in this paper.
Meta TagsDetails
Citation
Bullers, W., "Tunnel Boring a Mine Slope," 29th Annual Earthmoving Industry Conference, Peoria, Illinois, United States, April 11, 1978, .
Additional Details
Publisher
Published
2/1/1978
Product Code
780481
Content Type
Technical Paper
Language
English