MHD Repowering of a 250 MWe Unit of the TVA Allen Steam Plant

929286

08/03/1992

Event
27th Intersociety Energy Conversion Engineering Conference (1992)
Authors Abstract
Content
Coal fired MHD repowering is considered for the TVA Allen Steam Plant. The performance of the repowered plant is presented. Cost comparisons are made of the cost of repowering with MHD versus the cost of meeting similar standards by installing scrubbers and selective catalytic NOx reduction (SCNR). For repowering of a single 250 MWe unit, the costs favor scrubbing and SCNR. If one considers a single repowering of all three 250 MWe units by a single MHD topping cycle and boiler, MHD repowering is more economical. Environmental emissions from the repowered plant are estimated.
Meta TagsDetails
DOI
https://doi.org/10.4271/929286
Pages
5
Citation
Chapman, J., and Attig, R., "MHD Repowering of a 250 MWe Unit of the TVA Allen Steam Plant," SAE Technical Paper 929286, 1992, https://doi.org/10.4271/929286.
Additional Details
Publisher
Published
Aug 3, 1992
Product Code
929286
Content Type
Technical Paper
Language
English