Agent Based Scheduling in Production System

2001-01-3225

10/1/2001

Authors
Abstract
Content
The objective in a flexible manufacturing system is an optimal system resources scheduling. The production scheduling of such system may be resolved by a set of individual agents, which can work parallel and their coordination may bring a more effective way to find an optimal solution. Criteria for the optimal solution may be created on the time or economical (cost) basis but each may have a different priority depending on each situation. In this paper we will analyse an approach to find a feasible schedule of all products, which could minimize their costs and satisfy all constrains jointed with each product.
Meta TagsDetails
Citation
Frankovic, B., Dang, T., and Moeller, K., "Agent Based Scheduling in Production System," Automotive and Transportation Technology Congress and Exposition, Barcelona, Spain, October 1, 2001, .
Additional Details
Publisher
Published
10/1/2001
Product Code
2001-01-3225
Content Type
Technical Paper
Language
English